Suitable Width: 915mm
Material Thickness: 0.7-1.2mm or customized
Forming Station: 26 steps
Shaft Diameter: 75/95mm
Producing Speed: 15-25m/min or custom design
Cutting Blade Material: Cr12MoV
Parameters | Specification |
Voltage | 380V/50HZ/3PH or customized |
Driving Motor | 18.5KW |
Hydraulic Press/Cuting Motor | 5.5KW |
Forming Steps | 26 |
Working Speed | 15-25m/min |
Material Width | 915mm |
Thickness for Steel | 0.7-1.2mm |
Shaft Diameter | 75/95mm |
Shaft Material | High grade 45# forged steel |
Roller Material | 45# steel with polished and heat treatment (base on raw material type) |
PLC Cabinet | Schneider, Mitsubishi or Delta |
Encoder | Omron |
Sprocket Wheel | 45 steel high-frequencies quench |
Cutting Blade Material | Cr12MoV steel |
Machine Frame Material | Fine welded structural steel; |
Roofing Material | PPGI, GI steel G245-345 |
Painted Color | Blue+Gray White Or Customization |
Overall Size | 13600*1650*1600mm |
Weight | 8500KGS |
1. When pouring concrete floor slab, there is no need to set formwork and support, so that the construction has greater flexibility. Constructors can start from any floor of the building, instead of proceeding from bottom to top in the traditional way.
2. Positive moment reinforcement is not required for concrete floor design;
3. The wedge-shaped concrete block between the ribs of the dovetail steel bearing plate can withstand all kinds of deformation caused by strong earthquakes, which enhances the integrity of the floor;
4. Because 600 closed necking type floor deck has complex wedge section resistance moment, it has mechanical performance and more economical span;
5. The closed necking type floor deck saves more concrete than the general concrete floor;
6. The closed necking type floor deck system saves more formwork, time and economy than the general concrecte floor;
7. The closed necking type floor system does not need to add additional fireproof layer;
8. The closed necking type floor system can provide the 600 type - dovetail suspension system for or temporary use. There is no need to pre-embed any embedded parts before the floor slab is poured. Pipelines and equipment can be directly hung between the slab ribs through the dovetail type hanging system, which can save a lot of labor and time.
9. Under the condition of correct use, 600 closed necking type floor deck can provide a safe working platform before the floor concrete pouring.